-10%
LEEPEE Bluetooth 5.0 Tire Pressure Monitoring System, 5 Alarm Modes, with 4 External Sensors TPMS, Support iOS and Android, Real-time Displays Pressure and Temperature (0.1-6.4Bar)
Original price was: $58.99.$53.09Current price is: $53.09.
【 Multiple alarm types 】 Bluetooth5.0 Tire Pressure Monitoring System provide five types of alarms include quick/slow leak alarm, High voltage alarm, High-temperature alarm and low battery alarm. Users can set the pressure, temperature and battery alarm values